13,000+
Diameter Inches Welded
The Incahuasi field is one of Bolivia's most important gas production assets. Incahuasi began its natural decline in 2022, going from a capacity of 11 million SM³/day to a current production of 7.3 million. Sustaining that level required interventions in the plant, not the wells.
The solution consisted of reassigning one of the export compressors to low pressure service, located upstream of the process train. This change of configuration—from Parallel compressors to a serial alignment—reduced inlet pressure and eliminated bottlenecks, without the need to modify existing heat exchange trains.
On-site execution
Diameter Inches Welded
meters of power and control cables
Meters of piping installed
kg of structural assembly
April 2025
March 2026
332 days