Projects
our experience
Throughout our trajectory we have carried out projects for the production and repair of pipelines, assembly of facilities, civil works and logistics support in the coast, mountains and jungle. Our multidisciplinary capabilities allow us to tackle projects of diverse complexity and magnitude, mainly under EPC scheme
Construction, Laying and Maintenance of Ducts & Buried Power Lines
| PROJECT | CLIENT | LOCATION | PERIOD |
|---|---|---|---|
| MEDIDAS DE MITIGACIONES PARA LÍNEA DE CONDUCCIÓN L ESC X-3 AP-118 | Total Austral S.A. | La Escalonada, Aguada Pichana, Neuquen, Argentina | 09.2024 - 04.2025 |
| RP - LAT-132 KV | Total Austral S.A. | La Escalonada, Aguada Pichana, Neuquen, Argentina | 09.2024 - 04.2025 |
| MONTAJE PUESTA A TIERRA PIQUETES RP - LAT-132 KV | Total Austral S.A. | Rincon de los Sauces, Neuquen, Argentina | 09.2024 - 03.2025 |
| CONSTRUCCIÓN DE FACILIDADES DE PRODUCCIÓN Y FLOWLINES – PROYECTO SAGARI | REPSOL EXPLORACION PERU SUCURSAL DEL PERU | LOTE 57, CUSCO, PERÚ. | 12.2016 – 05.2018 |
| CONSTRUCCIÓN DE SISTEMA DE COLECCIÓN Y BOMBEO DE AGUA DESDE POZOS FERROBAMBA | MINERA LAS BAMBAS S.A. | COTABAMBAS, APURÍMAC, PERÚ. | 06.2016 – 12.2016 |
| REPARACIÓN DE TUBERÍAS EN ÁREAS DE APOYO RACKS EN PLANTA DE FRACCIONAMIENTO | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 11.2015 – 03.2017 |
| DERIVACIÓN DUCTO MALVINAS - SAN MARTÍN 1 - KM17+800 a KM18+800 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 11.2015 – 04.2016 |
| INGENIERÍA CONSTRUCCIÓN Y MONTAJE DEL GASODUCTO LOOP COSTA II | TRANSPORTADORA DE GAS DEL PERÚ (TGP) | LURÍN – CHILCA (LIMA, PERÚ) | 07.2015 – 04.2016 |
| REPARACIÓN DUCTO COMPARTIDO EN "LA DONCELLA" - FLOWLINE 18" NM - PAG A (PK 26+000) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2015 – 01.2016 |
| CONSTRUCCIÓN DE LÍNEA DE TRANSMISIÓN DE MEDIA TENSIÓN, Y LÍNEAS DE DESCARGA DE AGUA | HUDBAY PERU S.A.C | CHUMBIVILCAS, CUSCO, PERÚ. | 01.2015 – 08.2015 |
| REPARACIÓN DE DUCTOS LOTE 08 – FASE 01 | PLUSPETROL NORTE S.A. | LOTE 08, IQUITOS, PERÚ. | 02.2014 – 08.2015 |
CONSTANCIA PROJECT SOW-0509 - TAILINGS AND WATER RECOVERY SYSTEM - S.M.P. & PIPELINES INSTALLATION | AUSENCO PERU S.A.C | CHUMBIVILCAS, CUSCO, PERÚ. | 12.2013 – 11.2014 |
CAMISEA EXPANSIÓN PROJECT FLOWLINE DESIGN & CONSTRUCTION, MIPAYA - NUEVO MUNDO - PAGORENI A | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 05.2011 – 09.2013 |
CAMISEA EXPANSIÓN PROJECT FLOWLINE DESIGN & CONSTRUCTION, CASHIRIARI 1 - CASHIRIARI 3 (LOTE 88) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 11.2008 – 11.2009 |
UPSTREAM EXPANSION PROJECT RECOMPOSICIÓN DE DDV Y CONTROL DE EROSIÓN PERMANENTE MALVINAS – PAGORENI A/B (LOTE 56) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 03.2008 – 10.2008 |
UPSTREAM EXPANSION PROJECT DESMONTAJE DE PUENTE CAMISEA. (LOTE 56) & REUBICACIÓN DE CABLES DE 33 KV. (LOTE 56) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 03.2008 – 10.2008 |
| TRASLADO DE SUBESTACIÓN ELÉCTRICA (LOTE 56-88) - PAGORENI A – CASHIRIARI I | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 2008 |
UPSTREAM EXPANSIÓN PROJECT PAGORENI A/B – MALVINAS (LOTE 56) & CASHIRIARI 1 – MALVINAS (LOTE 88) FLOWLINE DESIGN & CONSTRUCTION | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 02.2007 – 08.2008 |
| TRASLADO DE SUBESTACIÓN ELÉCTRICA (LOTE 56) - PAGORENI B – PAGORENI A | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2006 – 03.2007 |
UPSTREAM EXPANSIÓN PROJECT POWER SUPPLY TO DRILLING & BURIED PIPES PAGORENI B + OTROS | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 06.2005 – 06.2006 |
| EJECUCIÓN DE LA INGENIERÍA, COMPRAS, CONSTRUCCIÓN Y ASISTENCIA AL COMISIONADO DE LA CONEXIÓN ICS-05 | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 02.2021 – 11.2021 |
| EJECUCIÓN DE LA INGENIERÍA, COMPRAS, CONSTRUCCIÓN Y ASISTENCIA AL COMISIONADO DE LA CONEXIÓN ICS-03 | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 04.2018 – 05.2019 |
EJECUCIÓN DE LA INGENIERÍA, COMPRAS, CONSTRUCCIÓN Y ASISTENCIA AL COMISIONADO DE LA CONEXIÓN AL GSCY (exYABOG) | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 04.2018 – 03.2020 |
| INGENIERÍA BÁSICA EXTENDIDA CONEXIÓN ICS-05 | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 05.2019 – 12.2019 |
| CONSTRUCCIÓN DE UN LOOP DE 26 KM EN CAÑERÍA DE 10" ENTRE LAS LOCALIDADES DE VILA VILA - CRUCE LURIBAY - EXPANSIÓN GAA 3B - TRAMO II | TRANSREDES S.A. | BOLIVIA | 09.2009 – 02.2010 |
| CONSTRUCCIÓN DE UN LOOP ENTRE LAS LOCALIDADES DEL THOLAR - VILLA REMEDIOS, EXPANSIÓN GAA 3B TRAMO III EN UN DIÁMETRO DE 10"" Y UNA LONGITUD DE 32 KM. | TRANSREDES S.A. | BOLIVIA | 05.2009 – 09.2009 |
| CONSTRUCCIÓN DEL TRAMO III DEL GASODUCTO CARRASCO - COCHABAMBA DE 59 KM DE 16" - CONSORCIO SERPETBOL -BOLINTER | TRANSREDES S.A. | BOLIVIA | 07.2008 – 04.2009 |
| PROVISIÓN DE EQUIPOS Y MANO DE OBRA PARA CONSTRUCCIÓN LÍNEA DE HDPE DE 10" | MINERA SAN CRISTÓBAL | BOLIVIA | 06.2008 – 07.2008 |
| CONSTRUCCIÓN GASODUCTO LOOP EXPANSIÓN GVT - FASE II TRAMO II TARIJA - ENTRE RÍOS - 37,60 KM. DE 10" | TRANSREDES S.A. | BOLIVIA | 11.2007 – 05.2008 |
| CONSTRUCCIÓN GASODUCTO LOOPS EXPANSIÓN GAA III FASE "A" - TRAMO COHANI - CAIHUASI - 25 KM. DE 10". | TRANSREDES S.A. | BOLIVIA | 05.2007 – 09.2007 |
| CONSTRUCCIÓN GASODUCTO LOOP DEL GAA TRAMO PONGO - COHANI (UBICACIÓN PONGO - JAPOKASA) - KM. 21,5 DE 10 | TRANSREDES S.A. | BOLIVIA | 06.2006 – 10.2006 |
| CONSTRUCCIÓN LAZO LOOP EXPANSIÓN GAA - DUCTO DE 10" LONGITUD DE 25 KM. DESDE LA COMUNIDAD ESTEBAN ARCE HASTA ESTACIÓN SICA SIC | TRANSREDES S.A. | BOLIVIA | 03.2006 – 06.2006 |
| INSTALACIÓN DE BY PASS EN AMBOS LADOS DEL RÍO PILCOMAYO EN LAS LÍNEAS DE LOS SURIS Y ESCONDIDO | BG BOLIVIA CO. | BOLIVIA | 02.2006 – 03.2006 |
| REPARACIÓN GASODUCTO EN EL SALAO, CAMBIO DE REVESTIMIENTO Y ENTIERRO | TRANSREDES S.A. | BOLIVIA | 01.2006 – 01.2006 |
AMPLIACIÓN DE LA RED PRIMARIA DE GAS NATURAL INSTALADA EN TARIJA, CONSTRUCCIÓN DEL TRAMO EL PAJONAL - ENTRE RÍOS - LONGITUD DE 5.750 MTS. DIÁMETRO DE 2" AMPLIACIÓN DE LA RED PRIMARIA DE GAS NATURAL INSTALADA EN TARIJA, CONSTRUCCIÓN DEL TRAMO LA PINTADA - CONCEPCIÓN - RUJERO - LONGITUD DE 13.500 MTS. DE 2" | Y.P.F.B. | BOLIVIA | 02.2005 – 11.2005 |
| CONSTRUCCIÓN DE DOS RAMALES DE GASODUCTO YABOG - MADREJONES - TACOBO - YABOG - 30,9 KM. DE 12" | PLUSPETROL | BOLIVIA | 08.2004 – 03.2005 |
| MANTENIMIENTO SISTEMA DE DUCTOS TRANSREDES - SERVICIOS DE REVESTIMIENTO DE GSCY - OPCIÓN LÍQUIDOS POLIURETANOS | TRANSREDES S.A. | BOLIVIA | 04.2004 – 12.2005 |
| CONSTRUCCIÓN GASODUCTO INTERNO GRAVETAL - PUERTO SUÁREZ | GRAVETAL | BOLIVIA | 04.2003 – 06.2003 |
| CONSTRUCCIÓN Y MONTAJE DE LAS LÍNEAS DE COLECTA (FLOWLINE) Y DE LAS LÍNEAS DE EXPORTACIÓN (EXPORT LINE) PARA EL CAMPO SÁBALO - LÍNEAS DE RECOLECCIÓN 10" Y 12" Y LÍNEAS DE EXPORTACIÓN DE 8" Y 28". - CONSORCIO GDK - SERPETBOL. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 05.2002 – 08.2003 |
| TRABAJOS DE LÍNEA DE RECOLECCIÓN 4" EN CAMPO ESCONDIDO. | BG BOLIVIA CO. | BOLIVIA | 08.2001 – 10.2001 |
| MANTENIMIENTO BRECHA GASODUCTO AL BRASIL - 556 KM. DESDE PLANTA RIO GRANDE A PUERTO SUÁREZ. | TRANSREDES S.A. | BOLIVIA | 08.2001 – 11.2001 |
| INSTALACIÓN SISTEMA DE DUCTOS DE 6" Y 3" PARA BATERÍAS, ALMACENAJE Y TRANSPORTE PATUJUSAL. | CHACO S.A. | BOLIVIA | 10.2001 – 12.2001 |
| CONSTRUCCIÓN GASODUCTO A CUIABÁ DE 18" EN EL TRAMO KM. 0+000 AL KM. 76. | CHACO S.A. | BOLIVIA | 07.1999 – 02.2000 |
CONSTRUCCIÓN GASODUCTO 8" - EXPANSIÓN GASODUCTO AL ALTIPLANO. TRAMO PAROTANI - SAYARI. LOOP GAA. Y CONSTRUCCIÓN OLEODUCTO HAYÑACOTA - TERMINAL COCHABAMBA. | CHACO S.A. | BOLIVIA | 03.1999 – 10.2000 |
| CONSTRUCCIÓN DE ESTACIÓN CABECERA CARRASCO, ESTACIONES DE BOMBEO INTERMEDIAS LIMATAMBO Y PAMPATAMBO Y LA TERMINAL DE LLEGADA EN LA REFINERÍA DE CBBA. (OLEODUCTO CARRASCO - CBBA.). | TRANSREDES S.A. | BOLIVIA | 02.1999 – 02.2000 |
| REPARACIÓN GASODUCTO 24" -COLPA - YACUIBA, TRABAJOS DE CAMBIO DE TRAMOS, CAMISAS, VÁLVULAS, PROFUNDIZACIONES Y OTROS EN SECCIONES I Y II (SANTA CRUZ - KP.33 - SAIPURÚ KP.157) Y MANTENIMIENTO GASODUCTO 24" COLPA – YACUIBA | TRANSREDES S.A. | BOLIVIA | 11.1998 – 12.1998 |
| CONSTRUCCIÓN Y MONTAJE ESTACIÓN DE BOMBEO TIGÜIPA, 3 UNIDADES DE BOMBEO PRINCIPALES, 3 BOMBAS BOOSTER, MANIFOLDS DE ENTRADA Y SALIDA, SISTEMAS DE CONTROL; INTERCONEXIÓN PIPING, ELECTRICIDAD E INSTRUMENTACIÓN, DTM DE 2 TANQUES DE 5000 BBLS C/U. | TRANSREDES S.A. | BOLIVIA | 09.1998 – 10.2000 |
| MANTENIMIENTO VÍAS DE GASODUCTOS Y OLEODUCTO OCCH, GTT Y GCM EN SUCRE- BOLIVIA. TRAMO DE 86 KM. EN TERRENO MONTAÑOSO Y DIFÍCIL. | TRANSREDES S.A. | BOLIVIA | 02.1998 – 06.1998 |
| PROYECTO DE CRUCE DEL GASODUCTO DE 24” SOBRE EL RÍO PILCOMAYO. | TRANSREDES S.A. | BOLIVIA | 02.1998 – 03.1998 |
| MANTENIMIENTO DERECHO DE VÍA DE GASODUCTO COLPA - POCITOS Y OLEODUCTO CAMIRI - POCITOS. TRAMO DE 127 KM EN TERRENO DE SERRANÍA. | TRANSREDES S.A. | BOLIVIA | 01.1998 – 07.1998 |
| PARTICIPANTES DEL CONSORCIO BRM-CPB ADJUDICATARIOS DEL CONTRATO DE CONSTRUCCIÓN DEL GASODUCTO AL BRASIL - TRAMO BOLIVIANO. 560 KM. DE 32”. PROVISIÓN DE EQUIPO DE CONSTRUCCIÓN DE DUCTOS. | PETROGASBOL - PETROBRAS | BOLIVIA | 08.1997 – 01.1999 |
| REPARACIÓN DUCTO ESCONDIDO - LA VERTIENTE Y PROFUNDIZACIÓN DE LÍNEA EN RÍO PILCOMAYO - VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 07.1997 – 08.1997 |
| CONSTRUCCIÓN OLEODUCTO CARRASCO - VALLE HERMOSO - COCHABAMBA, CON CAÑERÍAS DE 6”, 8” Y 10” DE DIÁMETRO Y UNA LONGITUD DE 247 KM. (ASOCIADOS CON PROTEXA S.A.MEXICO) | Y.P.F.B. GERENCIA INDUSTRIAL | BOLIVIA | 03.1997 – 07.1998 |
| REPARACIÓN DE EMERGENCIA DEL POLIDUCTO Y GASODUCTO VILLA MONTES - TARIJA, ZONA LOS MONOS. | Y.P.F.B. GERENCIA INDUSTRIAL | BOLIVIA | 03.1997 – 03.1997 |
| TRABAJOS DE EMERGENCIA REALIZADO EN GASODUCTO A LA ARGENTINA. CONSTRUCCIÓN DE UNA LÍNEA BY PASS DE 12” - LONGITUD ESTIMADA DE 1.300 MTS. EN CRUCE LECHO DEL RÍO PILCOMAYO APOYADA EN LA ESTRUCTURA DEL PUENTE FERROVIARIO EN VILLA MONTES. | YACIBOL BOGOC TRANSP. YABOG | BOLIVIA | 02.1997 – 02.1997 |
| CONSTRUCCIÓN GASODUCTO MINERO - SAN RAMÓN, UBICADO EN LAS PROVINCIAS SANTISTEVAN Y ÑUFLO DE CHÁVEZ, DPTO. DE SANTA CRUZ. 110 KM. CON CAÑERÍA DE 3 ½”. | COMPAÑÍA NACIONAL DE GAS - CNG | BOLIVIA | 06.1996 – 10.1996 |
| OBRA DE AMPLIACIÓN DE OLEODUCTO ENTRE CAMPO SURUBÍ Y LA ESTACIÓN DE RECOLECCIÓN DE CARRASCO. | Y.P.F.B. MAXUS BOLIVIA, INC. | BOLIVIA | 12.1995 – 03.1996 |
| PROYECTO Y CONSTRUCCIÓN DE LAS LÍNEAS DE SURGENCIA DEL POZO R-1006 Y UN GASODUCTO Y OLEODUCTO DESDE ESTACIÓN DE SEPARACIÓN PRIMARIA HASTA PLANTA DE GAS DE YACIMIENTO RAMOS - PCIA. SALTA, TARTAGAL - ARGENTINA, CON PROVISIÓN DE TODOS LOS EQUIPOS Y MATERIALES NECESARIOS. LONGITUD APROX. DE CADA UNA DE LAS LÍNEAS SON: 2 LÍNEAS DE SURGENCIA DE 6 KM. C/U. DE 4” Y 8”. GASODUCTO DE 6.5 KM. DE 12” Y OLEODUCTO DE 6.5 KM. DE 6”. | PLUSPETROL ARGENTINA | BOLIVIA | 10.1995 – 01.1996 |
| CONSTRUCCIÓN Y TENDIDO LÍNEA RECOLECCIÓN DE 4” - 16 KM. DESDE CAMPO ESCONDIDO A PLANTA LA VERTIENTE Y CRUCE DE RÍO PILCOMAYO. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 09.1995 – 11.1995 |
| CONSTRUCCIÓN GASODUCTO CARRASCO - VÍBORA - YAPACANÍ, CAÑERÍA DE 12” Y UNA LONGITUD DE 70 KM. | MENDEZ JUNIOR Y ASOCIADOS | BOLIVIA | 03.1994 – 11.1994 |
| RECUPERACIÓN CAÑERÍA GASODUCTO LATERAL TITA, PROVINCIA CORDILLERA DEL DPTO. DE SANTA CRUZ. (ASOCIADOS CON CONPROPET Y BOLINTER). | Y.P.F.B. PROYECTO INTEGRAL AL BRASIL | BOLIVIA | 10.1993 – 04.1994 |
| CONSTRUCCIÓN DE UN OLEODUCTO ENTRE CAMPO CARRASCO Y CAMPO CARANDA - 39 KM. DE LONGITUD CON CAÑERÍA DE 10” DIÁMETRO. CONTRATO ALDC-78/92. (ASOC. CON I.S.T.) | Y.P.F.B. GID NORTE | BOLIVIA | 08.1993 – 12.1993 |
| INSTALACIÓN DE PLANTA DE ACONDICIONAMIENTO DE GAS NATURAL DESHIDRATADO EN EL CAMPO VÍBORA - PROVINCIA ICHILO DEL DPTO. DE SANTA CRUZ. | INGENIERIA TAURO | BOLIVIA | 05.1993 – 09.1993 |
| CONSTRUCCIÓN GASODUCTO ENTERRADO ENTRE VINTO Y PAROTANI PARA TRANSPORTE DE GAS NATURAL Y REALIZACIÓN DE PRUEBA HIDROSTÁTICA. LONGITUD APROX. 21 KM. Y DIÁMETRO EXTERNO DE 4.5” | Y.P.F.B. GERENCIA INDUSTRIAL | BOLIVIA | 04.1993 – 06.1993 |
| TRABAJOS VARIOS DE INTERCONEXIÓN DE LÍNEAS MATRICES A INSTALACIONES INDUSTRIALES CON MONTAJE DE ESTACIONES REGULADORAS Y DE MEDICIÓN EN COCHABAMBA. | EMCOGAS S.A.M. | BOLIVIA | 11.1992 – 02.1994 |
| MANTENIMIENTO MECÁNICO Y CIVIL DE DUCTOS DE 2” Y 12” DE DIÁMETRO, ENTIERRO DE LÍNEAS, CONSTRUCCIÓN DE VARIANTES, REVISIÓN Y CORRECCIÓN DE DEFECTOS DE CONSTRUCCIÓN Y OTRAS PRESTACIONES PERTENECIENTES AL SISTEMA DE DUCTOS DEL DISTRITO GID NORTE, OLEODUCTO Y GASODUCTO COCHABAMBA - ORURO - LA PAZ, SECTOR ALTIPLANO. | Y.P.F.B. GID NORTE | BOLIVIA | 11.1992 – 05.1997 |
| LÍNEAS DE CONDUCCIÓN DE HIDROCARBUROS EN FORMA DE GAS NATURAL Y DERIVADOS DE PETRÓLEO, 17 KM. EN CAÑERÍA DE 4½” DE DIÁMETRO, CRUCE DE RÍO DE 1.2 KM. X 2 LÍNEAS EN CAÑERÍA DE 4½” DESDE LOS POZOS DEL CAMPO EL ESCONDIDO HASTA LA PLANTA DE LA VERTIENTE. LÍNEA DE RECOLECCIÓN DE 6.780 MTS. EN CAÑERÍA DE 3½” EN CAMPO EL ESCONDIDO - VILLA MONTES, TARIJA. (ASOC. CON BOLINTER). | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 06.1992 – 08.1992 |
| APERTURA DE ZANJA, LIJADO, SOLDADO, ENCINTADO Y ENTERRADO DE LÍNEAS DE RECOLECCIÓN DE GAS Y DERIVADOS DESDE EL CAMPO TAIGUATI A LA PLANTA LA VERTIENTE. 37 KM. DE 4½”. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 01.1991 – 02.1991 |
| ENTIERRO 55 KM. DE DUCTOS EN DIÁMETRO 6” CON PROTECCIÓN, EXCAVACIÓN, LIMPIEZA, PRIMER, REVESTIMIENTO CAÑERÍA, BAJADO DE CAÑERÍA Y CUBRIR ZANJA, EN EL TRAMO COMPRENDIDO ENTRE NOVILLERO Y PLANTA VALLE HERMOSO, COCHABAMBA. | Y.P.F.B. GID NORTE | BOLIVIA | 06.1990 – 08.1990 |
| MANTENIMIENTO DE DUCTOS GID NORTE EN GASODUCTO TAPIRANI - TRAMO NOVILLERO - COCHABAMBA. | Y.P.F.B. GID NORTE | BOLIVIA | 07.1989 – 09.1990 |
| RECUPERACIÓN 4.500 MTS. CAÑERÍA DE 12” DEL OLEODUCTO SANTA CRUZ - SICA SICA - ARICA, TRAMO CHILLIJCHI - POCONA. | Y.P.F.B. GID NORTE | BOLIVIA | 1989 |
| CONSTRUCCIÓN POLIDUCTO DE 4” SISTEMA DE RECOLECCIÓN ENTRE CAMPO TAIGUATI Y PLANTA LA VERTIENTE (37 KM), LÍNEAS BOCA DE POZO AL MANIFOLD EN CAÑERÍA DE 4” DISTANCIA 4.5 KM. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 04.1989 – 06.1989 |
| CONSTRUCCIÓN VARIANTE EN OLEODUCTO OSSA, CAÑERÍA 10 ¾” DE 4,5 KM. POCONA - CHILLIJCHI. | Y.P.F.B. GID NORTE | BOLIVIA | 11.1988 – 01.1989 |
| MANTENIMIENTO DE DUCTOS GID NORTE EN GASODUCTO TAPIRANI - COCHABAMBA EN EL TRAMO NOVILLERO - COCHABAMBA. | Y.P.F.B. GID NORTE | BOLIVIA | 07.1988 – 07.1989 |
| SOLDADURA 2DA. FASE GASODUCTO LAZO SUD - 6.310 MTS. DE 10 ¾” - SANTA CRUZ. | YABOG - Y.P.F.B. | BOLIVIA | 07.1988 – 07.1988 |
| CONSTRUCCIÓN GASODUCTO Y POLIDUCTO - 350 KM. EN CAÑERÍA DE 4½”. TRANSPORTE Y TENDIDO DE CAÑERÍA, SOLDADO DE LÍNEA, LIMPIEZA Y PINTADO, ENCINTADO Y ENTIERRO, MONTAJE DE PUENTES Y OBRAS ESPECIALES. VILLA MONTES - TARIJA. | YABOG - Y.P.F.B. | BOLIVIA | 01.1988 – 11.1988 |
| TRASLADO Y TENDIDO CAÑERÍA DE 10 3/4” DE SAMAIPATA AL KM. 79 SAMAIPATA - LA GUITARRA. | YABOG - Y.P.F.B. | BOLIVIA | 09.1987 – 10.1987 |
| MANTENIMIENTO DE DUCTOS GID NORTE EN GASODUCTO TAPIRANI - COCHABAMBA EN EL TRAMO NOVILLERO - COCHABAMBA. | Y.P.F.B. GID NORTE | BOLIVIA | 07.1987 – 07.1988 |
| TRASLADO DE CAÑERÍA DE 10 ¾” GASODUCTO AL ALTIPLANO DE ORURO A TOTORA, POJO Y SAIPINA. | PROTEXA S.A. - Y.P.F.B. | BOLIVIA | 06.1987 – 08.1987 |
| CONSTRUCCIÓN EMPALMES DE CRUCE DE CAMINOS EN EL TRAMO PAROTANI POCONA - GASODUCTO AL ALTIPLANO, COCHABAMBA, TRASLADO Y TENDIDO DE CAÑERÍA DE 10 3/4", 100 KM. DE PAROTANI A POCONA - COCHABAMBA. | PROTEXA S.A. | BOLIVIA | 05.1997 – 06.1987 |
| CONSTRUCCIÓN GASODUCTO TARIJA - EL PUENTE, 43 KM. CAÑERÍA 4½” TENDIDO Y DISTRIBUCIÓN DE CAÑERÍA, SOLDADURA, LIMPIEZA, PINTADO Y ENCINTADO DE LÍNEA, ENTIERROS Y OBRAS ESPECIALES. (ASOC. CON BOLINTER). | Y.P.F.B. | BOLIVIA | 01.1987 – 03.1987 |
| MANTENIMIENTO GASODUCTO COLPA - YACUIBA KM. 400 AL 360. CONTRATO # 53/86 - YACUIBA KM. 440 AL 340 - CONTRATO # 94/86 - YACUIBA KM. 440 AL 530 - CONTRATO # 22/86 - TARIJA | YABOG - Y.P.F.B. | BOLIVIA | 03.1986 – 11.1986 |
| CONSTRUCCIÓN DEFENSIVOS PARA DESVÍO DE RÍO YAPACANÍ Y POSTERIOR CONSTRUCCIÓN DE LÍNEA DEL GASODUCTO YAPACANÍ - CARANDA. | Y.P.F.B. | BOLIVIA | 1983 – 1985 |
| PROVISIÓN DE EQUIPOS PARA TRABAJOS DE EMERGENCIA EN OLEODUCTO EN EL RÍO PIRAÍ (TARUMÁ) BERMEJO. | Y.P.F.B. | BOLIVIA | 1983 |
| CRUCE Y ENTERRADO EN RÍO PANTANO 120 MTS. DE CAÑERÍA DE 6 5/8” PARA PROPANODUCTO RÍO GRANDE - REFINERÍA. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 12.1983 |
| CONSTRUCCIÓN DE 6 KM. DE LÍNEA DE RECOLECCIÓN CON CAÑERÍA DE 3 ½” DE POZO 7 A LA VERTIENTE - VILLA MONTES. TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 6.1983 |
| CONSTRUCCIÓN GASODUCTO A ZONA DE HOSPITALES, 800 MTS. CON CAÑERÍA DE 3½” - SANTA CRUZ. | YABOG | BOLIVIA | 01.1983 – 02.1983 |
| PROVISIÓN DE PERSONAL Y EQUIPO PESADO PARA CONSTRUCCIÓN, TENDIDO Y CONEXIONES EN MEDIO DEL RÍO - RÍO GRANDE, LÍNEA DE RECOLECCIÓN RGD-3 Y 16. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1982 |
| CONSTRUCCIÓN Y MONTAJE DE PUENTE PROVISIONAL, INCLUYENDO MATERIAL PARA REHABILITACIÓN DE LÍNEAS DE PRODUCCIÓN DE LOS POZOS RGD-3 Y RGD-16 - SANTA CRUZ. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1982 |
| CONSTRUCCIÓN LÍNEA A ESTACIÓN SATÉLITE PLANTA DE CARANDA - TENDIDO Y SOLDADO 3 KM. DE 3½”. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 9.1982 |
| CONSTRUCCIÓN LÍNEA DE GAS A EMPRESA INTERLATINA, 400 MTS. DE 2” - SANTA CRUZ. | YABOG | BOLIVIA | 7.1982 |
| CONSTRUCCIÓN LÍNEA SOLDADA DE 3½” PARA PROVEER GAS A SOBOLMA, 1.5 KM. - SANTA CRUZ. | YABOG | BOLIVIA | 06.1982 – 06.1982 |
| CONSTRUCCIÓN BY-PASS PROPANODUCTO RIO GRANDE - SANTA CRUZ, CAÑERÍA DE 3½” Y PROVISIÓN EQUIPOS PARA TRABAJOS VARIOS. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 6.1982 |
| UBICACIÓN SOPORTES OLEODUCTO LA PEÑA - SANTA CRUZ. PROVISIÓN PERSONAL CALIFICADO Y EQUIPOS PARA TRABAJOS EMERGENCIA EN CARANDA. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1981 |
| TENDIDO DE 2 LÍNEAS DE 3½” DESDE LÍNEA MATRIZ DE 6” A POZO # 9 Y TERMINACIÓN DEL POZO, 362 MTS. ADICIONALES DE LÍNEA EN LA VERTIENTE, TOTAL 2.000 MTS. VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 05.1981 – 06.1981 |
| SOLDADO LÍNEA DE 3½” RGD-54. CONSTRUCCIÓN CRUCE LÍNEAS A POZOS RGD-11, 54, 55 DE 3½”. SOLDADO LÍNEA DE 6 5/8”. TENDIDO LÍNEA DE 6” POZOS RGD-1, 54, 55 LONGITUD 800 MTS. Y ALQUILER DE EQUIPOS RÍO GRANDE, LA PEÑA Y COLPA. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 8.1981 |
| CONSTRUCCIÓN DE MANIFOLD Y CONEXIONES A LA PLANTA LA VERTIENTE Y POZOS 4, 5, 6, 7 Y 8 VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 1981 |
| CONSTRUCCIÓN SISTEMA DE HIDRANTES PLANTA LA VERTIENTE, 1.000 MTS. DE 3½” - VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 09.1981 – 10.1981 |
| CONSTRUCCIÓN LÍNEAS DE RECOLECCIÓN DEL POZO 8, 930 MTS. DE 4½” LA VERTIENTE - VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 09.1981 – 10.1981 |
| CONSTRUCCIÓN LÍNEAS DE RECOLECCIÓN DE 6 5/8” Y 3” PARA POZO # 8, 6 KM. - LA VERTIENTE, VILLA MONTES - TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 3.1981 |
| INSTALACIÓN DE UNA LÍNEA ENTERRADA DE PRODUCCIÓN PARA EL POZO COLPA-51 A LA PLANTA, LONGITUD 3 KM. - LÍNEA DE 3½”. SANTA CRUZ. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1980 |
| FABRICACIÓN, TENDIDO Y SOLDADO ACUEDUCTO DE 24” PARA RIEGO Y MONTAJE DE MOTOBOMBA IMPULSORA, 1.200 MTS. SANTA CRUZ. | AGRONORTE | BOLIVIA | 1980 |
| CONSTRUCCIÓN LÍNEAS DE RECOLECCIÓN POZO 7, TENDIDO Y SOLDADO DE LÍNEAS 6.300 MTS. DE 6 5/8” Y 15 KM. DE 3 ½”. LA VERTIENTE, VILLA MONTES - TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 06.1980 – 07.1980 |
Assembly of facilities and surface installations
| PROJECT | CLIENT | LOCATION | PERIOD |
|---|---|---|---|
| CONTRATO MARCO WELL PADS, SUMIDEROS Y MONITORES BdC | Pluspetrol BDC | Rincon de los Sauces, Neuquen, Argentina | 01.2026 - ACTUAL |
| WP2 - DERIVACION DE AGUA D-3001 A D-3003 | Total Austral S.A. | Planta, Aguada Pichana, Neuquen, Argentina | 12.2025 - 03.2026 |
| MONITOREO PERMANENTE DE METANOS, (INST INSTRUMENTACION (1000 und Y 18 CAMARAS deteccion Metano); APE; ASR; RCNZA | Pluspetrol BDC | La Escalonada, Aguada Pichana, Neuquen, Argentina | 03.2025 - 11.2025 |
| CONTRATO LLAVE EN MANO DE INGENIERÍA INTEGRAL, PROVISIÓN DE EQUIPOS, CONSTRUCCIÓN, COMISIONADO, PUESTA EN SERVICIO DE INSTALACIÓN DE COMPRESIÓN DE GAS EN CAMPO MIPAYA - LOTE 56 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 09.2023 – ACTUAL |
| INGENIERIA, PROCURA Y CONSTRUCCION DEL PROYECTO “PISCO LPG TRUCK LOADING EXPANSION” LOTE 88 Y 56 | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 05.2023 – ACTUAL |
| SERVICIO DE CAMBIO DE AISLAMIENTO Y RECUPERACIÓN DE ESPESOR POR SOLDADURA EN TORRES DEETANIZADORAS DE UNIDADES CRIOGÉNICAS 3, 4 Y 5. | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 05.2023 – 09-2024 |
| EPC LEAN CLUSTER PAGORENI B Y CASHIRIARI 3 INCLUYE HABILITACIÓN Y VINCULACIÓN POZO PAG-1002 | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 04.2023 – 09.2024 |
| PISCO OPERATION ASSURANCE - PHASE 1 | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 03.2022 – 10.2023 |
| SERVICIO DE CONSTRUCCIÓN DE LA NUEVA LINEA DE DESCARGA DE RELAVES ESTE – TMF | HUDBAY PERU S.A.C | CHUMBIVILCAS, CUSCO, PERÚ. | 01.2021 – 02.2022 |
| MALVINAS FLARE SYSTEM UPGRATING PROJECT & MALVINAS LOW PRESSURE VENTILING COLLECTOR, MALVINAS WATER DISPOSAL ASSURANCE PROJECT - PUMP STATION UPGRADE, MALVINAS MERCURY REMOVAL INSTALLATION, MALVINAS DERIVATION OF OILY WATER FROM TEG SYSTEM INSTALLATION Y OBRAS CIVILES Y ELECTROMECÁNICAS VARIAS EN LOS LOTES 88 Y 56 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 12.2020 – ACTUAL |
| EPC-36 BALANCE DE PLANTA – PISCO DIESEL BLENDING | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 10.2018 – 10.2019 |
| EPC WHCP2021 – CASHIRIARI WELL HEAD COMPRESSION | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 06.2018 – 08.2021 |
| PROYECTO MALVINAS OPERATION ASSURANCE (MOA) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 02.2017 – 12.2018 |
| CONEXIÓN DE BOMBAS ADICIONALES EN OVERFLOW DE ESPESADORES DE RELAVES | MINERA LAS BAMBAS S.A. | COTABAMBAS, APURÍMAC, PERÚ. | 08.2016 – 12.2016 |
| SERVICIO DE REUBICACIÓN DE FLARE STACK Y CIMENTACIÓN PANEL BAKER - SAN MARTÍN 1 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 08.2016 – 12.2016 |
| SERVICIO DE OBRAS DE MEJORAMIENTO DEL SISTEMA CONTRA INCENDIO EN MALVINAS | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2015 – 02.2016 |
| MEJORAS EN PLANTA MALVINAS – SM 121-2013, SM 027-2014 Y SM 036-2014 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 03.2015 – 01.2016 |
| TOROMOCHO PROJECT CC-40 - HARMONIC FILTERS YARD | MINERA CHINALCO PERÚ / JACOBS | MOROCOCHA, JUNÍN, PERÚ. | 01.2013 – 12.2013 |
| CAMISEA SECOND EXPANSION PROJECT MIPAYA CLUSTER AND PAGORENI A CLUSTER JUMPOVER - BLOCK 56 (EPC-CM/JO) – EPC CONTRACT. | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 04.2012 – 06.2013 |
| CAMISEA SECOND EXPANSION PROJECT AMPLIACIÓN SISTEMA DE CAPTACIÓN Y TRATAMIENTO EFLUENTES PLUVIALES O CRW | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 04.2011 – 10.2012 |
| CAMISEA SECOND EXPANSION PROJECT EPC-21 MALVINAS PLANT (As part of Joint Venture). | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 05.2010 – 01.2013 |
| TOROMOCHO PROJECT GRIFO DE SUMINISTRO DE DIESEL DE 40,000 GALONES | AKER SOLUTIONS PERU S.A / JACOBS. | MOROCOCHA, JUNÍN, PERÚ. | 04.2010 – 08.2010 |
| CAMISEA EXPANSIÓN PROJECT CLUSTER CASHIRIARI 3 (LOTE 88) – EPC CONTRACT. | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 06.2008 – 02.2010 |
| CAMISEA EXPANSIÓN PROJECT BURIED PIPES CASHIRIARI 3 (LOTE 88) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 05.2009 – 07.2009 |
| CAMISEA EXPANSIÓN PROJECT MONTAJE 5º COMPRESOR EN PLANTA MALVINAS, CLUSTER CASHIRIARI 1 & OTROS (LOTE 88). | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 03.2008 – 05.2009 |
| UPSTREAM EXPANSION PROJECT BURIED PIPES AT INSTALLATION - CASHIRIARI 1 (LOTE 88) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 01.2008 – 06.2008 |
| UPSTREAM EXPANSION PROJECT MONTAJE ELECTROMECÁNICO CLUSTERS PAGORENI A/B Y CRUCE RÍO CAMISEA (LOTE 56). | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 07.2007 – 08.2008 |
| TIE-INS DE PLANTA MALVINAS | PLUSPETROL PERU CORPORATION S.A. | MALVINAS, CUSCO, PERÚ | 11.2006 – 03.2007 |
| CONSTRUCCIÓN DE BURIED PIPES EN PAGORENI A | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2006 – 12.2006 |
| MONTAJE DE TURBOGENERADOR Y EQUIPOS AUXILIARES EN JIBARITO | HANOVER PERU SELVA S.R.L. | LOTE 1AB, LORETO, PERÚ | 01.2006 – 05.2006 |
| MONTAJE DE LAS INSTALACIONES POZO SAN MARTÍN 3 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 01.2004 – 06.2004 |
| CONSTRUCCIÓN DE INGENIERÍA, PROCURA Y CONSTRUCCIÓN DEL PROYECTO AMPLIACIÓN GTS NORTE | REPSOL E&P BOLIVIA S.A. | CAIPIPENDI, TARIJA, BOLIVIA | 12.2021 – ACTUAL |
| EJECUCIÓN DE LA INGENIERÍA, COMPRAS, CONSTRUCCIÓN Y ASISTENCIA AL COMISIONADO DEL DEBOTTLENECKING (Ampliación de Planta de 6.5 MM a 11 MM). | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 04.2018 – 08.2019 |
| EJECUCIÓN DE LA INGENIERÍA, COMPRAS, CONSTRUCCIÓN Y ASISTENCIA AL COMISIONADO DEL TANQUE DE CONDENSADO | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 08.2018 – 03.2020 |
| INSTALACION DE LINEA DE REPOSICION DE AGUA EN PLANTA INCAHUASI | TOTAL E&P BOLIVIE | INCAHUASI, SANTA CRUZ, BOLIVIA | 10.2019 – 12.2019 |
| MODIFICACIÓN Y MANTENIMIENTO PLANTA SAN CRISTÓBAL | SAN CRISTÓBAL | BOLIVIA | 07.2007 – 12.2007 |
| CONSTRUCCIÓN Y MANTENIMIENTO DE PLANTA MINERA SAN CRISTÓBAL | SAN CRISTÓBAL | BOLIVIA | 03.2005 – 09.2007 |
| INSTALACIÓN MEDIDORES DE CAUDAL EN LAS ESTACIONES DE COMPRESIÓN DE IZOZOG Y ROBORÉ | GTB - TRANSREDES | BOLIVIA | 03.2005 – 09.2005 |
| MONTAJE MECÁNICO PLANTA DE GAS TACOBO | PLUSPETROL | BOLIVIA | 10.2004 – 04.2005 |
| AMPLIACIÓN DE PLANTA DE COMPRESIÓN RÍO GRANDE. ETAPA 3 | REPSOL YPF | BOLIVIA | 12.2002 – 12.2003 |
| PROVISIÓN DE PERSONAL PARA OPERACIÓN Y MANTENIMIENTO EN PLANTA DEW POINT YAPACANI, CAPACIDAD DE PRODUCCIÓN DE 35 MMCFD | HANOVER - ANDINA | BOLIVIA | 2002 |
| CONSTRUCCIÓN Y MONTAJE PLANTA DEW POINT YAPACANI, CAPACIDAD DE PRODUCCIÓN DE 35 MMCFD. | HANOVER - ANDINA | BOLIVIA | 11.2001 – 01.2002 |
| PLANTA DE EXTRACCIÓN CO2 - YACIMIENTO MADREJONES. | PLUSPETROL | BOLIVIA | 10.2001 – 03.2002 |
| PROVISIÓN DE PERSONAL PARA OPERACIÓN Y MANTENIMIENTO - PLANTA CARRASCO: PLANTA DEW POINT DE 35 MMCFD DE CAPACIDAD DE PROCESO. | HANOVER - CHACO | BOLIVIA | 2001 |
| CONSTRUCCIÓN Y MONTAJE DE LA PLANTA DEW POINT CARRASCO | HANOVER | BOLIVIA | 07.2001 – 09.2001 |
| OPERACIÓN Y MANTENIMIENTO ESTACIÓN DE COMPRESIÓN SAN JOSÉ DE CHIQUITOS EN GASODUCTO BOLIVIA - BRASIL (KM. 242) | HANOVER - GTB | BOLIVIA | 09.2001 – 03.2003 |
| INSTALACIÓN Y MONTAJE DE ESTACIÓN DE COMPRESIÓN SAN JOSÉ DE CHIQUITOS CON 5 COMPRESORES 3616 Y 3516, COOLERS, FILTROS E INTERCONEXIONES PARA COMPRESIÓN DEL GASODUCTO BOLIVIA - BRASIL. | HANOVER - GTB | BOLIVIA | 07.2001 – 09.2001 |
| SISTEMA DE IMPLEMENTACIÓN LÍNEA DE GAS, SISTEMA GAS LIFT PALOMA - BLOQUE MAMORE | MAXUS BOLIVIA INC. | BOLIVIA | 05.2001 – 06.2001 |
| AMPLIACIÓN PLANTA DE LA VERTIENTE, INSTALACIÓN DE CAPACIDAD ADICIONAL DE PROCESO DE 95 MMCFD. | PETROFAC / BG | BOLIVIA | 03.2001 – 09.2001 |
| REFORMAS EN ESTACIÓN DE BOMBEO # 1, EN REFINERÍA PALMASOLA - CAMBIOS DE VÁLVULAS, INTERCONEXIÓN, PIPING, ELECTRICIDAD E INSTRUMENTACIÓN. | WILLBROS - TRANSREDES | BOLIVIA | 01.2001 – 11.2001 |
| CONSTRUCCIÓN, MONTAJE, PUESTA EN MARCHA, INGENIERIA Y PROVISIÓN DE MATERIALES - PLANTA DE TRATAMIENTO DE GAS MADREJONES | PLUSPETROL | BOLIVIA | 01.2001 – 06.2001 |
| MONTAJE E INSTALACIÓN DE COMPRESORES EN PLANTA VÍBORA. | ANDINA S.A. | BOLIVIA | 08.2000 – 12.2000 |
| TRASLADO DE BATERÍA DESDE KATARI A BULO BULO, DEPARTAMENTO DE COCHABAMBA. OBRAS CIVILES, SEPARADORES, BOMBAS, SISTEMA DE INTERCONEXIÓN PIPING, VÁLVULAS, ELECTRICIDAD, INSTRUMENTACIÓN. | CHACO S.A. | BOLIVIA | 03.2000 – 05.2000 |
| TRABAJOS DE SOLDADURA EN INTERCONEXIONES DE COMPRESORES EN PLANTAS DE SURUBÍ Y PALOMA. | MAXUS BOLIVIA INC. | BOLIVIA | 12.1999 – 01.2000 |
| MONTAJE Y OPERACIÓN DE PLANTA PAQUETIZADA EN TRINEOS, PUNTO ROCÍO "DEW POINT", CAPACIDAD 35 MMCFD EN MONTEAGUDO - CHUQUISACA. | HANOVER - MAXUS | BOLIVIA | 09.1999 – 08.2001 |
| OPERACIÓN INSTALACIONES PLANTA SURUBÍ, COMPRESORES, BOMBAS Y EQUIPOS DE INTERCONEXIÓN. | HANOVER - MAXUS | BOLIVIA | 07.1999 – 06.2003 |
| CONSTRUCCIÓN DE ESTACIONES DE BOMBEO DEL OLEODUCTO. CARRASCO - COCHABAMBA. (ESTACIONES INTERMEDIAS LIMATAMBO Y PAMPATAMBO Y LA TERMINAL DE LLEGADA EN LA REFINERÍA DE COCHABAMBA). | TRANSREDES S.A. | BOLIVIA | 02.1999 – 02.2000 |
| CONSTRUCCIÓN MANIFOLD PARA ESTACIÓN DE YAPACANÍ Y TRABAJOS ADICIONALES | TRANSREDES S.A. | BOLIVIA | 09.1998 – 10.1998 |
| DESMONTAJE, TRASLADO Y MONTAJE ESTACIÓN BOMBEO TIGUIPA | TRANSREDES S.A. | BOLIVIA | 09.1998 – 12.1999 |
| OPERACIÓN Y MANTENIMIENTO DE PLANTA DE GAS CRIOGÉNICA, COMPRESORES Y BOMBAS EN PLANTA DE PALOMA. | HANOVER - MAXUS | BOLIVIA | 1.1998 |
| MANTENIMIENTO DE PLANTAS É INSTALACIONES MECÁNICAS, CAMINOS, PLANCHADAS Y PLANTAS RÍO GRANDE Y LA PEÑA - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 09.1997 – 06.1998 |
| INSTALACIÓN DE PLANTA DE ACONDICIONAMIENTO DE GAS NATURAL DESHIDRATADO EN EL CAMPO VÍBORA - PROVINCIA ICHILO DEL DPTO. DE SANTA CRUZ. | INGENIERIA TAURO | BOLIVIA | 05.1993 – 09.1993 |
| PROVISIÓN DE OPERADORES PARA ESTACIÓN DE PRODUCCIÓN DE POZOS SURUBÍ - X1 Y X2. | MAXUS BOLIVIA INC. | BOLIVIA | 09.1992 – 02.1994 |
| SERVICIOS GENERALES PARA OPERACIÓN DE LOS CAMPOS EN PRODUCCIÓN DE BUENA VISTA, CAMATINDI, CAIGUA Y SANANDITA, UBICADOS EN EL ÁREA DEL CHACO BOLIVIANO. CONTRATO PARA MANTENIMIENTO Y CONSTRUCCIÓN CON CUADRILLA COMPLETA DE EQUIPO PESADO. CONTRATO PARA MANTENIMIENTO DE PRODUCCIÓN CON EQUIPOS DE SOLDADURA Y ACCESORIOS MECÁNICOS. TARIJA Y CHUQUISACA. | SOL PETROLEO S.A. ARGENTINA | BOLIVIA | 07.1989 – 12.1991 |
| CONTINUACIÓN DE OPERACIÓN Y MANTENIMIENTO PLANTA DE GAS LA VERTIENTE, VILLA MONTES - TARIJA Y CONTINUACIÓN CONTRATO DE MANTENIMIENTO DE CAMINOS Y PLANCHADAS CAMPO LA VERTIENTE - VILLA MONTES. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 07.1979 – 03.1998 |
| MONTAJE DE PLANTA DE PROCESAMIENTO Y BOMBEO DE GAS EN MONTEAGUDO, SUCRE. | Y.P.F.B. | BOLIVIA | 02.1974 – 05.1974 |
| CONSTRUCCIÓN Y MONTAJE DE LA PLANTA DE REINYECCIÓN Y RECICLAJE DE RÍO GRANDE. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1972 |
| MONTAJE PLANTA DE PROCESAMIENTO DE GAS EN COLPA. | Y.P.F.B. DIVISIÓN SANTA CRUZ | BOLIVIA | 1969 – 1972 |
| AMPLIACIÓN PLANTA DE CARANDA. | YABOG | BOLIVIA | 1968 |
civil works
| PROJECT | CLIENT | LOCATION | PERIOD |
|---|---|---|---|
| EPC INSTALACIÓN DE PANTALLAS DE PILOTES EN LOCACIÓN KINTERONI | REPSOL EXPLORACION PERU SUCURSAL DEL PERU | LOTE 57, CUSCO, PERÚ. | 12.2023 – ACTUAL |
| ESTABILIZACIÓN DE LA PLATAFORMA KINTERONI | REPSOL EXPLORACION PERU SUCURSAL DEL PERU | LOTE 57, CUSCO, PERÚ. | 10.2017 – 06.2018 |
| MEJORAMIENTO DEL AERÓDROMO DE NUEVO MUNDO. | REPSOL EXPLORACION PERU SUCURSAL DEL PERU | LOTE 57, CUSCO, PERÚ. | 04.2015 – 05.2016 |
| BLOCK 76 PROJECT ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC) OF ONE BASECAMP AND ONE DRILLING PLATFORMS | HUNT OIL COMPANY OF PERU LLC SUCURSAL DEL PERU | LOTE 76, MADRE DE DIOS, PERÚ. | 09.2013 – 03.2015 |
| POZO LOS ÁNGELES CONSTRUCCIÓN DE PLATAFORMA DE PERFORACIÓN, ADECUACIÓN DE TROCHA DE ACCESO Y SERVICIOS ASOCIADOS | CEPSA PERUANA S.A.C. | LOTE 131, PUCALLPA, PERÚ. | 03.2013 – 09.2013 |
| B67 DEVELOPMENT PROJECT PIRAÑA SITE PREPARATION | PERENCO PERU PETROLEUM LIMITED SUCURSAL DEL PERU | LOTE 67, IQUITOS, PERÚ. | 09.2012 – 05.2013 |
| CAMISEA EXPANSION PROJECT SAN MARTIN EAST FIELD DESIGN, CONSTRUCTION & INSTALLATION (BLOCK 88) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 05.2012 – 04.2013 |
| CAMISEA EXPANSION PROJECT MIPAYA AND PAGORENI WEST FIELDS DESIGN, CONSTRUCTION & INSTALLATION (BLOCK 56) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 03.2010 – 10.2011 |
| TOROMOCHO PROJECT LOSA DE ALMACÉN DE NITRATO DE AMONIO (Incluye Sistema de Puesta a Tierra). | AKER SOLUTIONS PERU S.A / JACOBS. | MOROCOCHA, JUNÍN, PERÚ. | 04.2010 – 07.2010 |
| TOROMOCHO PROJECT EXPLOSIVE WAREHOUSE BUILDING FOUNDATIONS | AKER SOLUTIONS PERU S.A / JACOBS. | MOROCOCHA, JUNÍN, PERÚ. | 03.2010 – 04.2010 |
| REFINERÍA LA PAMPILLA OBRA CIVIL PARA EL PROYECTO RLP 10.1 B. MODIFICACIONES DE UNIDADES UDP-1 Y UDV-1. | REPSOL EXPLORACION PERU SUCURSAL DEL PERU | LIMA, PERÚ. | 11.2009 – 03.2010 |
| CAMISEA EXPANSION PROJECT SERVICIO DE EXPLORACIÓN Y ESTUDIOS CON FINES DE “EIA” PARA EXTENSIÓN DEL FLOWLINE Y LOCACIONES DEL LOTE 56 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2009 – 08.2010 |
| MOVIMIENTO DE TIERRA Y EXVACACIÓN EN DOS MUERTOS DE ANCLAJE DE SAN MARTÍN 3 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 07.2007 – 04.2007 |
| MONTAJE DE MUERTOS DE ANCLAJE EN SAN MARTÍN 1 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 10.2006 – 12.2006 |
| MONTAJE DE MUERTOS DE ANCLAJE EN SAN MARTÍN 3 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 09.2006 – 12.2006 |
| FABRICACIÓN Y MONTAJE DE PUENTES CARRETEROS | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 06.2006 – 10.2006 |
| MANTENIMIENTO TROCHA MALVINAS - PAGORENI B | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 07.2006 – 04.2007 |
| CONSTRUCCIÓN DE OBRAS CIVILES EN POZO INCAHUASI X2. | TOTAL E&P BOLIVIE | BOLIVIA | 06.2010 – 03.2011 |
| SERVICIOS DE INGENIERÍA POZO INCAHUASI X2 | TOTAL E&P BOLIVIE | BOLIVIA | 02.2010 – 05.2010 |
| CONSTRUCCIÓN PLANCHADA BLOQUE AQUIO. | TOTAL E&P BOLIVIE | BOLIVIA | 09.2009 – 02.2010 |
| CONSTRUCCIÓN DE CAMINOS Y PLANCHADAS SBL-7 Y SBL-8 CONSORCIO SERPETBOL-BOLINTER. | TOTAL E&P BOLIVIE | BOLIVIA | 05.2009 – 04.2010 |
| CONSTRUCCIÓN DIQUE DE COLAS - FASE I. | PAN AMERICAN SILVER | BOLIVIA | 05.2008 – 11.2008 |
| CONSTRUCCIÓN PLATAFORMA DE ESTACIÓN DE COMBUSTIBLE | PAN AMERICAN SILVER | BOLIVIA | 5.2008 |
| MEJORAMIENTO Y MANTENIMIENTO DE CAMINOS QUE CONECTEN A SAN VICENTE. | PAN AMERICAN SILVER | BOLIVIA | 02.2008 – 06.2008 |
| MOVIMIENTO DE TIERRA EN SAN VICENTE (EXCAVACIÓN EN PLANTA PROCESADORA, NIVELACIÓN DE TIERRA, CAMINOS DE ACCESO A SAN VICENTE Y AL DIQUE DE COLAS, NIVELACIÓN DE PLATAFORMAS Y TRABAJOS DE PERFORACIÓN Y VOLADURA. | PAN AMERICAN SILVER | BOLIVIA | 10.2007 – 03.2008 |
| OBRAS CIVILES EN GENERAL Y APOYO LOGÍSTICO EN EL BLOQUE PETROLERO SAN ANTONIO (ISIRI). | PETROBRAS BOLIVIA S.A. | BOLIVIA | 08.2007 – 07.2010 |
| CONSTRUCCIÓN Y MANTENIMIENTO DE CAMINOS, CONSTRUCCIÓN Y MANTENIMIENTO DE PLANCHADAS Y CONSTRUCCIÓN DE OBRAS CIVILES - CONSORCIO SERPETBOL-CONPROPET. | CHACO S.A. | BOLIVIA | 02.2007 – 02.2009 |
| MANTENIMIENTO DE CAMINOS AVAROA - RAMADITAS. | MINERA SAN CRISTÓBAL | BOLIVIA | 10.2007 – 09.2008 |
| SERVICIO DE CONSTRUCCIÓN Y MANTENIMIENTO DE LA PLANTA SAN CRISTÓBAL. | MINERA SAN CRISTÓBAL | BOLIVIA | 07.2007 – 12.2007 |
| APOYO Y MANTENIMIENTO DE OBRAS CIVILES (CAMINOS) Y SOPORTE LOGÍSTICO EN GENERAL EN BLOQUE SÁBALO (LOMA ALTA). | PETROBRAS BOLIVIA S.A. | BOLIVIA | 12.2006 – 11.2009 |
| CONTROL DE EROSIÓN, ESTABILIZACIÓN DE TALUDES, OBRAS EN PLANCHADA SBL-3, RECOMPOSICIÓN DEL DDV FLOWLINES, PROTECCIÓN DEL FLARE PGSAN Y MANTENIMIENTO DE TÚNEL. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 10.2006 – 04.2007 |
| CONSTRUCCIÓN DIQUES DE CONTROL DE EROSIÓN Y ESTABILIZACIÓN QUEBRADA SLB-5. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 12.2005 – 03.2006 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA EL POZO INGRE X-1. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 11.2005 – 07.2006 |
| VACIADO DE CONCRETO PARA HORMIGONES - CONSORCIO BBS - G&M. | MINERA SAN CRISTÓBAL | BOLIVIA | 06.2005 – 07.2006 |
| MOVIMIENTO MASIVO DE TIERRA - CONSORCIO BOLSER-BOLINTER-SERPETBOL. | MINERA SAN CRISTÓBAL | BOLIVIA | 01.2005 – 01.2006 |
| CONSTRUCCIÓN DE PLANCHADA PLANTA KANATA - RELEVAMIENTO TOPOGRÁFICO. | CHACO S.A. | BOLIVIA | 01.2005 – 04.2005 |
| CONSTRUCCIÓN DE CAMINO DE ACCESO Y PLANCHADA KNT FW X-1, KNN 3D, KNT 4H. | CHACO S.A. | BOLIVIA | 10.2004 – 11.2004 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA "TEA" PLANTA CARRASCO - RELEVAMIENTO TOPOGRÁFICO. | CHACO S.A. | BOLIVIA | 10.2004 – 02.2005 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA EL POZO INGRE X-1. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 11.2005 – 07.2006 |
| CONSTRUCCIÓN CAMINO TRONCAL NORTE, CAMINO Y PLANCHADA SÁBALO 5 - RELEVAMIENTO TOPOGRÁFICO | PETROBRAS BOLIVIA S.A. | BOLIVIA | 11.2004 – 04.2006 |
| CONSTRUCCIÓN PLANCHADA PLANTA TACOBO (RELEVAMIENTO TOPOGRÁFICO DE CAMINO Y PLANCHADA). | PLUSPETROL | BOLIVIA | 07.2004 – 08.2004 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA EL DORADO X-1004 (RELEVAMIENTO TOPOGRÁFICO DE CAMINO Y PLANCHADA). | CHACO S.A. | BOLIVIA | 05.2004 – 09.2004 |
| REHABILITACIÓN CAMINO Y PLANCHADA EN PALO MARCADO X-5. | BG BOLIVIA CO. | BOLIVIA | 04.2004 – 05.2004 |
| CONSTRUCCIÓN PISTA ENTRE RÍOS (RELEVAMIENTO TOPOGRÁFICO DE CAMINO Y PLANCHADA). | AEROESTE | BOLIVIA | 11.2003 |
| CONSTRUCCIÓN DEL CAMINO DE ACCESO Y PLANCHADA POZO PERCHELES X-1000. | CHACO S.A. | BOLIVIA | 01.2004 – 03.2004 |
| CONSTRUCCIÓN DEL CAMINO DE ACCESO Y PLANCHADA POZO KANATA NORTE X-2. | CHACO S.A. | BOLIVIA | 11.2003 – 01.2004 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA MARGARITA X-4 (RELEVAMIENTO TOPOGRÁFICO DE CAMINO Y PLANCHADA). | MAXUS BOLIVIA INC. | BOLIVIA | 07.2003 – 09.2003 |
| CONSTRUCCIÓN PLANCHADA INCAHUASI X-1 - MUYUPAMPA (RELEVAMIENTO TOPOGRÁFICO DE CAMINO Y PLANCHADA). | TOTAL FINA ELF | BOLIVIA | 05.2003 – 08.2003 |
| PLANCHADA PATUJUSAL 18 - RELEVAMIENTO TOPOGRÁFICO. | CHACO S.A. | BOLIVIA | 03.2003 – 05.2003 |
| PLANCHADA KANATA 02 - RELEVAMIENTO TOPOGRÁFICO. | CHACO S.A. | BOLIVIA | 03.2003 – 05.2003 |
| MANTENIMIENTO CAMINOS BULO BULO 2. | CHACO S.A. | BOLIVIA | 03.2003 – 04.2003 |
| FUNDACIONES SLEEPERS SÁBALO. | ASTRA | BOLIVIA | 09.2002 – 01.2003 |
| ARREGLO PLANCHADA EN POZO PATUJUSAL 7. | CHACO S.A. | BOLIVIA | 07.2002 – 08.2002 |
| ARREGLO CAMINO SANTA ROSA - SAN LUIS. | CHACO S.A. | BOLIVIA | 06.2002 – 07.2002 |
| REHABILITACIÓN CAMINO Y PLANCHADA CARRASCO 4. | CHACO S.A. | BOLIVIA | 02.2002 – 03.2002 |
| CAMINO DE ACCESO A LAS ANTORCHAS - SÁBALO. | ASTRA | BOLIVIA | 06.2002 – 09.2002 |
| CONSTRUCCIÓN PLANCHADA SAL D - RELEVAMIENTO TOPOGRÁFICO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 11.2002 – 04.2003 |
| CONSTRUCCIÓN TÚNEL EN LA SERRANÍA DEL AGUARAGÜE - RELEVAMIENTO TOPOGRÁFICO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 05.2002 – 08.2003 |
| APOYO Y MANTENIMIENTO DE OBRAS CIVILES (CAMINOS ) Y SOPORTE LOGÍSTICO EN GENERAL EN BLOQUE SÁBALO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 2002 |
| REHABILITACIÓN CAMINO ITAU 1. | TOTAL FINA ELF | BOLIVIA | 02.2002 – 07.2002 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA KANATA X1. | CHACO S.A. | BOLIVIA | 11.2001 – 01.2002 |
| REHABILITACIÓN PLANCHADA PATUJUSAL 11. | CHACO S.A. | BOLIVIA | 11.2001 – 01.2002 |
| REHABILITACIÓN PLANCHADA PATUJUSAL 12 - RELEVAMIENTO TOPOGRÁFICO. | CHACO S.A. | BOLIVIA | 10.2001 – 12.2001 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PATUJUSAL 15. | CHACO S.A. | BOLIVIA | 09.2001 – 12.2001 |
| REHABILITACIÓN CAMINO Y PLANCHADA CARRASCO 3 | CHACO S.A. | BOLIVIA | 08.2001 – 08.2001 |
| LOCATION AND ROAD CONSTRUCTION SERVICES, CONTRATO NO. BGBC-DRG-012-01 PARA CONSTRUCCIÓN DE CAMINOS Y PLANCHADAS EN LOS PROYECTOS: EDD # 2, EDD # 6, EDD # 4, LA VERTIENTE # 7, CAMINO EDD - LSR Y PLANCHADA LOS SURIS 5. | BG BOLIVIA CO. | BOLIVIA | 01.2001 – 12.2001 |
| CONSTRUCCIÓN PISTA ASFALTADA DE 1200 M. DE LARGO X 20 M. ANCHO - SÁBALO - PALOS BLANCOS - RELEVAMIENTO TOPOGRÁFICO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 07.2001 – 09.2001 |
| APOYO Y MANTENIMIENTO DE OBRAS CIVILES (CAMINOS ) Y SOPORTE LOGÍSTICO EN GENERAL EN BLOQUE SÁBALO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 01.2001 – 12.2001 |
| MOVIMIENTO DE TIERRA CONFORMACIÓN DE PLATAFORMA PARA PLANTA DEW POINT YAPACANI - RELEVAMIENTO TOPOGRÁFICO. | ANDINA S.A. | BOLIVIA | 10.2001 – 11.2001 |
| LÍNEAS DE RECOLECCIÓN 4" EN CAMPO EDD. | BG BOLIVIA CO. | BOLIVIA | 08.2001 – 10.2001 |
| MANTENIMIENTO BRECHA GASODUCTO AL BRASIL DE RIO GRANDE A PUERTO SUÁREZ CON 556 KMS DE BRECHA DE 20 MTS. DE ANCHO, REJAS, ÁREA DE VÁLVULAS Y OTROS. | TRANSREDES S.A. | BOLIVIA | 08.2001 – 12.2001 |
| CONSTRUCCIÓN VIVIENDA PARA OPERADORES EN LA VERTIENTE. | BG BOLIVIA CO. | BOLIVIA | 07.2001 – 08.2001 |
| PROVISIÓN DE EQUIPO PESADO PARA CONSTRUCCIÓN DE PLATAFORMAS Y REPRESAS EN MINA COLQUIRI. | COMPAÑÍA NACIONAL DE GAS - CNG | BOLIVIA | 06.2001 – 09.2001 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA POZO CUATRO OJOS - UBICADO EN LA PROVINCIA SARA - SANTA CRUZ. CONSTRUCCIÓN CAMINO: 2 KMS. Y MEJORAMIENTO CAMINO: 18 KMS. | CHACO S.A. | BOLIVIA | 07.2000 – 11.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO EL DORADO X-1002. ZONA DE ZANJA HONDA - DPTO. DE SANTA CRUZ. (CONST. 100 MTS. Y REHABIL. 20 KMS). | CHACO S.A. | BOLIVIA | 05.2000 – 12.2000 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA PARA POZO SAN ALBERTO - 14, BLOQUE SAN ALBERTO - TARIJA. - RELEVAMIENTO TOPOGRÁFICO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 09.2000 – 10.2000 |
| CONSTRUCCIÓN FOSA DE RECORTES SÁBALO - BLOQUE SAN ANTONIO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 09.2000 – 10.2000 |
| AMPLIACIÓN LOMA ALTA - OBRAS CIVILES EN GENERAL - BLOQUE SAN ALBERTO 12. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 07.2000 – 12.2000 |
| CONSTRUCCIÓN PLANCHADA DE ACCESO Y OBRAS CIVILES SABALO X-2 - RELEVAMIENTO TOPOGRÁFICO. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 06.2000 – 09.2000 |
| CAMINO INTERLIGACIÓN A POZOS LADO SUR CAMPO SÁBALO X-2 | PETROBRAS BOLIVIA S.A. | BOLIVIA | 01.2000 – 06.2000 |
| CONSTRUCCIÓN PISTA DE ATERRIZAJE DE 1.200 MTS X 50 MTS DE ANCHO. | SOCIEDAD AGROPECUARIA SARA | BOLIVIA | 02.2000 – 04.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO EVA EVA UBICADO EN SAN IGNACIO DE MOXOS - BENI. (CAMINO: 2 KMS Y PLANCHDA: 20.000 M²). | MAXUS BOLIVIA INC. | BOLIVIA | 06.2000 – 08.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO TACOBO X-1001 - BLOQUE SAN ISIDRO, PROV. CORDILLERA - SANTA CRUZ. (9 KMS) VOLÚMEN DE OBRA CONSTRUÍDA 60.000 M³ - RELEVAMIENTO TOPOGRÁFICO. | PLUSPETROL | BOLIVIA | 04.2000 – 06.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAIPIPENDI X-1001 - BLOQUE CAIPIPENDI, PROV. CORDILLERA - SANTA CRUZ. | REPSOL YPF | BOLIVIA | 03.2000 – 05.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SAN ALBERTO X-11 - BLOQUE SAN ALBERTO - TARIJA. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 01.2000 – 03.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SABALO X-3 - BLOQUE SAN ANTONIO - TARIJA. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 01.2000 – 03.2000 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1001 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 10.1999 – 12.1999 |
| CONSTRUCCIÓN DE DIQUE Y PLANCHADA PARA POZO CAMIRI X-1002 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 10.1999 – 12.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PAUJIL X-1 - BOLIVIA. | MAXUS BOLIVIA INC. | BOLIVIA | 09.1999 – 11.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALOMA X-4 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 08.1999 – 10.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CURICHI X-1 - BOLIVIA. | MAXUS BOLIVIA INC. | BOLIVIA | 08.1999 – 10.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CARANDA X-1 - BOLIVIA. | ANDINA S.A. | BOLIVIA | 07.1999 – 09.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1003 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 07.1999 – 09.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALOMA X-3 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 07.1999 – 09.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SURUBÍ X-3 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 06.1999 – 08.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1004 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 06.1999 – 08.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALOMA X-2 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 05.1999 – 07.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SURUBÍ X-2 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 05.1999 – 07.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1005 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 05.1999 – 07.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALOMA X-1 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 04.1999 – 06.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SURUBÍ X-1 - BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 04.1999 – 06.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1006 - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 04.1999 – 06.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALO MARCADO X-5. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 03.1999 – 05.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO LOS SURIS X-4. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 03.1999 – 05.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO LOS SURIS X-5. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 02.1999 – 04.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO ITAU X-1. | TOTAL EXPLORATION PETROLEUM BOLIVIE | BOLIVIA | 01.1999 – 03.1999 |
| REACONDICIONAMIENTO Y MEJORAMIENTO DE PISTA DE ATERRIZAJE EN LA VERTIENTE. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 06.1998 – 07.1998 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA LOS SURIS 4 (LSR - 4) TARIJA, BOLIVIA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 04.1998 – 06.1998 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA LOS SURIS 5 (LSR - 5) TARIJA, BOLIVIA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 04.1998 – 06.1998 |
| CONSTRUCCIÓN CAMINO ACCESO Y PLANCHADA PARA POZO EDD-X7 Y LSR-3. TARIJA, BOLIVIA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 02.1998 – 03.1998 |
| MANTENIMIENTO DE CAMINO Y PLANCHADA PARA POZO ITAU X-1 - BLOQUE XXW - SUR DE BOLIVIA - PROVISIÓN DE OBRAS CIVILES PARA CONSTRUCCIÓN DE CAMINO Y PLANCHADA Y LÍNEA DE AGUA. | TOTAL EXPLORATION PETROLEUM BOLIVIE | BOLIVIA | 01.1998 – 10.1999 |
| CONSTRUCCIÓN DEFENSIVOS EN RIO PARAPETÍ. | TRANSREDES S.A. | BOLIVIA | 01.1998 – 03.1998 |
| REPARACIÓN FOSA QUEMA BBL-3, TRABAJOS EN CAMINO Y PLANCHADA CARRASCO-4, REHABILITACIÓN GENERAL PLANCHADA CARRASCO-2 Y OTROS TRABAJOS EJECUTADOS EN PLANTA CARRASCO. | CHACO S.A. | BOLIVIA | 11.1997 – 09.1999 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO Y KANATA X2-CBBA. (400 MTS). | CHACO S.A. | BOLIVIA | 11.1997 – 04.1998 |
| REPARACIÓN PLANCHADA CARRASCO # 7 | CHACO S.A. | BOLIVIA | 10.1997 – 11.1997 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO KANATA X1 - CBBA. (400 MTS). | CHACO S.A. | BOLIVIA | 10.1997 – 11.1997 |
| PROVISIÓN EQUIPO DE REMOSIÓN RECORTES EN CAMPO LOS CUSIS. | CHACO S.A. | BOLIVIA | 08.1997 – 05.1998 |
| CONSTRUCCIÓN CAMINO (1 KM), 3 PUENTES DE MADERA Y PLANCHADA PARA POZO SAJTA - X1, ÁREA CHAPARE, COCHABAMBA - BOLIVIA. | CHACO S.A. | BOLIVIA | 06.1997 – 08.1997 |
| REPARACIÓN FOSA QUEMA BBL-3, TRABAJOS EN CAMINO Y PLANCHADA CARRASCO-4, REHABILITACIÓN GENERAL PLANCHADA CARRASCO-2 Y OTROS TRABAJOS EJECUTADOS EN PLANTA CARRASCO | CHACO S.A. | BOLIVIA | 11.1997 – 09.1999 |
| MANTENIMIENTO DE PLANTAS É INSTALACIONES MECÁNICAS, CAMINOS, PLANCHADAS Y PLANTAS RÍO GRANDE Y LA PEÑA - SANTA CRUZ. | ANDINA S.A. | BOLIVIA | 09.1997 – 06.1998 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA POZO VILLA TUNARI - X1 - COCHABAMBA. | REPSOL EXPLORATION SECURE S.A. | BOLIVIA | 08.1997 – 12.1997 |
| CONSTRUCCIÓN CAMINO DE 1,5 KMS. Y REHABILITACIÓN CAMINO DE 23 KMS. Y CONSTRUCCIÓN DE PLANCHADA PARA PERFORACIÓN DE POZO SAN ALBERTO X-10. | PETROBRAS BOLIVIA S.A. | BOLIVIA | 06.1997 – 12.1997 |
| REHABILITACIÓN CAMINO DE ACCESO A BATERÍA GUAIRUY Y LÍNEAS DE DESCARGA DE PETRÓLEO GUAIRUY A ESTACIÓN CHORETY. PROVISIÓN DE EQUIPO Y CUADRILLA DE MANTENIMIENTO. CAMIRI. | ANDINA S.A. | BOLIVIA | 04.1997 – 06.1997 |
| CONTINUACIÓN CONTRATO DE MANTENIMIENTO DE CAMINOS Y PLANCHADAS; OPERACIÓN Y MANTENIMIENTO DE PLANTA DE GAS EN CAMPO LA VERTIENTE, VILLA MONTES - TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 02.1997 – 03.1998 |
| REACONDICIONAMIENTO DE PLANCHADA Y CAMINO DE POZO TOLEDO X1 - ORURO. SEGÚN PLAN DE AMBIENTE. | ESSO EXPLORATION (BOLIVIA) LIMITED | BOLIVIA | 10.1996 |
| CONSTRUCCIÓN PLANCHADA PARA POZO EL VOLCÁN EN ÁREA DE BERMEJO. | PLUSPETROL | BOLIVIA | 06.1996 – 07.1996 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA Y MANTENIMIENTO DURANTE PERFORACIÓN DEL POZO TODOS SANTOS - X1, ZONA CHAPARE, CBBA. | BHP PETROLEUM (BOLIVIA) INC. | BOLIVIA | 05.1996 – 10.1996 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALO MARCADO - X4 EN VILLA MONTES - TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 03.1996 – 04.1996 |
| OPERACIÓN Y MANTENIMIENTO PLANTA DE GAS LA VERTIENTE, VILLA MONTES - TARIJA Y CONTINUACIÓN CONTRATO DE MANTENIMIENTO DE CAMINOS Y PLANCHADAS CAMPO LA VERTIENTE - VILLA MONTES. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 02.1996 – 01.1997 |
| CONSTRUCCIÓN CAMINO ACCESO Y RIPIADO CAMINO (3.5 KMS), RIPIADO DE CAMINO EXISTENTE (8 KMS), PLANCHADA, FOSA DE LODO Y AGUA Y ANTEPOZO PARA POZO IBIBOBO X2, VILLA MONTES. MOVIMIENTO DE 20.000 M² DE TIERRA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 10.1995 – 11.1995 |
| CONSTRUCCIÓN CAMINO, PLANCHADA Y PISTA, MÁS MANTENIMIENTO EN POZO MIRAFLORES - X2. | TEXACO EXPLORATION BOLIVIA CHACO INC. | BOLIVIA | 08.1995 – 03.1996 |
| MOVIMIENTO DE TIERRA Y RIPIADO DEL TRAMO CAMINERO CRUCE LIRIUNI - TAHUA CRUZ. | EMPRESA MISICUNI | BOLIVIA | 08.1995 – 12.1995 |
| CONSTRUCCIÓN BASE LOGÍSTICA DE OPERACIÓN Y PLANCHADA EN RURRENABAQUE POZO YARIAPÓ - X1. OPERACIÓN TOTALMENTE HELITRANSPORTABLE. | TOTAL OIL AND GAS EXPLORATION B.V. | BOLIVIA | 06.1995 – 10.1995 |
| CONSTRUCCIÓN CAMINO (17.5 KMS) Y PLANCHADA, CONSTRUCCIÓN DE ANTEPOZO Y VACIADO LOSA (60 M3) DE HORMIGÓN ARMADO EN POZO TOLEDO - X1, UBICADO EN EL DPTO. DE ORURO - PROV. SAUCARI. | HELMERICH & PAYNE / EXXON | BOLIVIA | 03.1995 – 05.1995 |
| CONSTRUCCIÓN DE PISTA DE ATERRIZAJE EN BLOQUE MADIDI - BENI. | TOTAL OIL AND GAS EXPLORATION B.V. | BOLIVIA | 02.1995 – 04.1995 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA EN POZO PALOMA “A” EN SURUBÍ, UBICADO EN ZONA BULO BULO. | MAXUS BOLIVIA INC. | BOLIVIA | 02.1995 – 05.1995 |
| CONSTRUCCIÓN Y MANTENIMIENTO CAMINO Y PLANCHADA ÑUPUCO X-101. | DIAMOND SHAMROCK BOLIVIANA LTD. | BOLIVIA | 01.1995 – 06.1995 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA EN POZO PALO MARCADO #3 UBICADO EN VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 10.1994 – 12.1994 |
| MEJORAMIENTO Y HABILITACIÓN RUTA CAMINERA SANTA CRUZ -PUERTO SUÁREZ, TRAMO QUIMOME - TAPERAS. 110 KMS. | CONACRUZ | BOLIVIA | 08.1994 – 10.1994 |
| CONSTRUCCIÓN PLATAFORMA Y CAMINO DE PLANTA TÉRMICA CARRASCO - COCHABAMBA. PLATAFORMA 41.759 M3. TERRAPLÉN 16.503 M3. | ENDE | BOLIVIA | 08.1994 – 06.1995 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA EN POZO SAN ANTONIO - X1 EN VILLA MONTES. 4,2 KMS. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 05.1994 – 05.1994 |
| MOVIMIENTO DE TIERRA Y CONCRETO PARA PLANCHADA DE CAMPAMENTO DE PRODUCCIÓN EN SURUBÍ. | MAXUS BOLIVIA INC. | BOLIVIA | 4.1994 |
| REFUERZO A AMPLIACIÓN DE CAMINO SURUBÍ C. MOVIMIENTO DE TIERRA, COMPACTACIÓN Y PILOTAJE DE MUROS. | MAXUS BOLIVIA INC. | BOLIVIA | 4.1994 |
| HABILITACIÓN DE CAMINO Y PLANCHADA DE POZO MATADOR - X1. | SANTA FE ENERGY RESORUCES DE BOLIVIA | BOLIVIA | 04.1994 – 05.1994 |
| MOVIMIENTO DE TIERRA EN POZO MATADOR - X1 ZONA ABAPÓ. | SANTA FE ENERGY RESORUCES DE BOLIVIA | BOLIVIA | 03.1994 – 04.1994 |
| PROVISIÓN DE EQUIPOS PARA REPARACIÓN DE CAMINO EL PALMAR. | SOPETROL | BOLIVIA | 12.1993 |
| RELOCALIZACIÓN Y ARREGLO CAMPAMENTO CUEVO WX-1 Y PROVISIÓN DE TRACTOR D7 PARA TRABAJOS EN PLANCHADA EN CUEVO W X-1. | CHEVRON INTERNATIONAL LTD. | BOLIVIA | 12.1993 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SURUBÍ C-1, EN ÁREA DE BULO BULO. (ASOC. CON CONPROPET 50%). | MAXUS BOLIVIA INC. | BOLIVIA | 09.1993 – 11.1993 |
| CONSTRUCCIÓN CAMINOS, PLANCHADA, FOSA PARA LODOS Y ANTEPOZO PARA EL POZO LOS SURIS - X2 EN EL DPTO. DE TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 09.1993 – 10.1993 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA EN IVIGARSAMA, UBICADO EN EL DPTO. DE COCHABAMBA. (ASOC. CON CONPROPET 50%). | MAXUS BOLIVIA INC. | BOLIVIA | 06.1993 – 08.1993 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SURUBÍ B-1 EN ÁREA DE BULO BULO. (ASOC. CON CONPROPET 50%) | MAXUS BOLIVIA INC. | BOLIVIA | 03.1993 – 06.1993 |
| CONSTRUCCIÓN DE CARRETERA DE ACCESO, ATRACADERO Y PLANCHADA (PLATAFORMA) PARA LA PERFORACIÓN DEL POZO PANDO - X2 EN ÁREA MADRE DE DIOS. | OCCIDENTAL BOLIVIANA INC. | BOLIVIA | 06.1992 – 08.1992 |
| MANTENIMIENTO CAMINOS Y BRECHAS, PLANCHADA Y PISTA DE ATERRIZAJE DE POZO MIRAFLORES Nº 1, UBICADO EN EL DPTO. DE CHUQUISACA. | TEXACO EXPLORATION BOLIVIA CHACO INC. | BOLIVIA | 06.1992 – 12.1992 |
| POZO PETROLERO MIRAFLORES Nº 1, UBICADO EN EL DPTO. DE CHUQUISACA: REHABILITACIÓN DE CAMINOS. LIMPIEZA Y MEJORAMIENTO DE BRECHAS Y CAMINOS YA EXISTENTES Y/O APERTURA DE TRAMOS ADICIONALES. CONSTRUCCIÓN DE PLANCHADA PARA POZO PETROLERO MIRAFLORES Nº 1, MÁS ANTEPOZO. CONSTRUCCIÓN DE UNA PISTA DE ATERRIZAJE. CONSTRUCCIÓN ÁREA DE CAMPAMENTO. | TEXACO EXPLORATION BOLIVIA CHACO INC. | BOLIVIA | 05.1992 – 06.1992 |
| SERVICIOS DE MANTENIMIENTO DE CAMINOS Y PLANCHADA SURUBÍ - X1 Y SURUBÍ - X2 EN ÁREA DE BULO BULO, CON PROVISIÓN DE PERSONAL, EQUIPOS Y RIPIO. (ASOC. CON CONPROPET 50%). | MAXUS BOLIVIA INC. | BOLIVIA | 01.1992 – 04.1997 |
| CONSTRUCCIÓN 16 KMS. DE CAMINO Y CONST. PLANCHADA POZO MANURIPI - X1. | OCCIDENTAL BOLIVIANA INC. | BOLIVIA | 07.1991 – 10.1991 |
| CONSTRUCCIÓN CAMINOS Y PLANCHADA PARA PERFORACIÓN DE POZO SURUBÍ - X1 EN ÁREA DE BULO BULO. (ASOC. CON CONPROPET - 28%). | MAXUS BOLIVIA INC. | BOLIVIA | 07.1991 – 12.1991 |
| TRABAJOS DE CONSTRUCCIÓN DE CAMINO DE ACCESO Y PLANCHADA PARA POZO CAIGUA CNX-1 VILLAMONTES, TARIJA. | SCEPTRE RESOURCES BOLIVIA | BOLIVIA | 05.1991 – 07.1991 |
| CONTRATO CON VELKO - CONSTRUCCIÓN PISTA DE ATERRIZAJE DE 1.500 MTS., 30 KMS. DE CAMINOS Y PLANCHADA PARA PERFORACIÓN POZO PANDO - X1 EN ÁREA MADRE DE DIOS. | OCCIDENTAL BOLIVIANA INC. | BOLIVIA | 04.1991 – 08.1991 |
| TRABAJOS DE MEJORAMIENTO DE CAMINOS TAHUA CRUZ, MISICUNI (APROX. 20 KMS). EXCAVACIÓN COMÚN, EXCAVACIÓN EN ROCA, OBRAS DE ARTE Y RIPIADO. | FONDO SOCIAL DE EMERGENCIA | BOLIVIA | 08.1990 – 01.1991 |
| CONSTRUCCIÓN DE CAMINO, PLANCHADA, FOSA PARA LODOS, FOSA PARA AGUA Y ANTEPOZO PARA EL POZO PORVENIR - 12. UBICADO EN EL DPTO. DE CHUQUISACA. | OCCIDENTAL BOLIVIANA INC. | BOLIVIA | 09.1990 – 11.1990 |
| CONSTRUCCIÓN DE CAMINOS, PLANCHADA, FOSA PARA LODOS, FOSA PARA AGUA, ANTEPOZO PARA EL POZO LA VERTIENTE - 10. VILLA MONTES, TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 09.1990 – 12.1990 |
| CONSTRUCCIÓN DE LA PLATAFORMA CARRETERA ASFALTADA SANTA CRUZ - ABAPÓ, GRUPO D - CONACRUZ, TRAMO PROGRESIVA KM. 121 + 479 A KM. 138 + 340. | CORDECRUZ | BOLIVIA | 03.1990 – 10.1993 |
| CONSTRUCCIÓN DE CAMINO DE ACCESO Y PLANCHADA TGT-3 - TAIGUATI - LA VERTIENTE, VILLA MONTES - TARIJA. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 07.1989 – 08.1989 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA CON FOSAS DE LODO Y AGUA MÁS ANTEPOZO PARA PERFORACIÓN POZOS ESCONDIDO 6A Y ESCONDIDO 7A. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 06.1989 – 07.1989 |
| CONSTRUCCIÓN CAMINO RIPIADO DE 9.4 KMS. - VILLA MONTES - ESCONDIDO. | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 04.1989 – 05.1989 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA CON FOSAS DE LODO Y AGUA MÁS ANTEPOZO PARA PERFORACIÓN POZOS ESCONDIDO-6 Y ESCONDIDO-7 | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 04.1989 – 05.1989 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA CON FOSAS DE LODO Y AGUA MÁS ANTEPOZO PARA PERFORACIÓN POZOS ESCONDIDO-4 Y ESCONDIDO-5 | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 03.1989 – 06.1989 |
| CONSTRUCCIÓN CAMINO DE ACCESO Y PLANCHADA CON FOSAS DE LODO Y AGUA MÁS ANTEPOZO PARA PERFORACIÓN POZO TGT-2 (TAIGUATI-2). | TESORO BOLIVIA PETROLEUM CO. | BOLIVIA | 01.1989 – 05.1989 |
| LIMPIEZA DE SENDA PAROTANI A LAS TRANCAS 180 KMS. Y DE LOS MONOS A BERMEJO 20 KMS. COCHABAMBA - BOLIVIA. | Y.P.F.B. | BOLIVIA | 09.1988 – 11.1988 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO TARIJA X-1. | Y.P.F.B. | BOLIVIA | 06.1988 – 08.1988 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMIRI X-1. | Y.P.F.B. | BOLIVIA | 04.1988 – 06.1988 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO TACOBO X-1. | Y.P.F.B. | BOLIVIA | 02.1988 – 04.1988 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO COLPA X-1. | Y.P.F.B. | BOLIVIA | 11.1987 – 01.1988 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO RÍO GRANDE X-1. | Y.P.F.B. | BOLIVIA | 09.1987 – 11.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO VIBORA X-1. | Y.P.F.B. | BOLIVIA | 07.1987 – 09.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO LA VERTIENTE X-1. | Y.P.F.B. | BOLIVIA | 05.1987 – 07.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SÁBALO X-1. | Y.P.F.B. | BOLIVIA | 03.1987 – 05.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SAN ALBERTO X-1. | Y.P.F.B. | BOLIVIA | 01.1987 – 03.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO ITAU X-1. | Y.P.F.B. | BOLIVIA | 11.1986 – 01.1987 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PALO MARCADO X-1. | Y.P.F.B. | BOLIVIA | 09.1986 – 11.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO LOS SURIS X-1. | Y.P.F.B. | BOLIVIA | 07.1986 – 09.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO ESCONDIDO X-1. | Y.P.F.B. | BOLIVIA | 05.1986 – 07.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO TAIGUATI X-1. | Y.P.F.B. | BOLIVIA | 03.1986 – 05.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAMATINDI X-1. | Y.P.F.B. | BOLIVIA | 01.1986 – 03.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO SANANDITA X-1. | Y.P.F.B. | BOLIVIA | 11.1985 – 01.1986 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO CAIGUA X-1. | Y.P.F.B. | BOLIVIA | 09.1985 – 11.1985 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO IBIBOBO X-1. | Y.P.F.B. | BOLIVIA | 07.1985 – 09.1985 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO PORVENIR X-1. | Y.P.F.B. | BOLIVIA | 05.1985 – 07.1985 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO MIRAFLORES X-1. | Y.P.F.B. | BOLIVIA | 03.1985 – 05.1985 |
| CONSTRUCCIÓN CAMINO Y PLANCHADA PARA POZO MANURIPI X-1. | Y.P.F.B. | BOLIVIA | 01.1985 – 03.1985 |
Provision of personnel, equipment and logistics support
| PROJECT | CLIENT | LOCATION | PERIOD |
|---|---|---|---|
| PROVISION MO ETAPA I 2025 YACIMIENTO APE; YACIMIENTO ASR; YACIMIENTO RCNZA | Total Austral S.A. | La Escalonada, Aguada Pichana, Neuquen, Argentina | 06.2025 - ACTUAL |
| SERVICIOS DE MEJORAS EN EL SISTEMA DE TRATAMIENTO DE AGUA DE PRODUCCIÓN - FASE II | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 07.2018 – 04.2019 |
| SERVICIOS DE MEJORAMIENTO Y HABILITACIÓN EN LA PLANTA MALVINAS Y LOCACIONES | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 11.2016 – 09.2017 |
| ASISTENCIA DE SERVICIOS DE PULLING - PAGORENI A & ASISTENCIA DRILLING MAL-1005WD-ST1 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 01.2016 – 03.2017 |
| LOCACIÓN DE SERVICIOS MINA CONSTANCIA | HUDBAY PERU S.A.C | CHUMBIVILCAS, CUSCO, PERÚ. | 08.2015 – 03.2016 |
| FULL EXPLORATION PLAN SERVICIOS DE OBRAS CIVILES VARIAS Y HABILITACIÓN DE LOCACIONES | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 08.2015 – 12.2016 |
| SERVICIO DE ASISTENCIA PARA ESTABILIZACIÓN DE FLARE EN SAN MARTÍN 1 | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 7.2015 |
| HABILITACION DE LOCACIÓN SAN MARTÍN 3 COILED TUBING | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 06.2015 – 07.2015 |
| HABILITACION DE PAT Y LPS MALVINAS 1005 COILED TUBING | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 05.2015 – 06.2015 |
| FULL EXPLORATION PLAN SERVICIO DE HABILITACIÓN DE LOCACION PULLING PAGORENI A E INSTALACIÓN DE GEOMENBRANA/MATTING KIMARO | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 01.2015 – 06.2015 |
| FULL EXPLORATION PLAN SERVICIO DE HABILITACIÓN DE LOCACIONES Y OTROS A PRECIOS UNITARIOS | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56/88, CUSCO, PERÚ. | 08.2013 – 01.2015 |
| TOROMOCHO PROJECT MISCELLANEOUS EARLY WORKS. (CC-37) | AKER SOLUTIONS PERU S.A / JACOBS. | MOROCOCHA, JUNÍN, PERÚ. | 07.2010 – 09.2013 |
| APERTURA DE HELIPUERTOS PARA LA CAMPAÑA DE CAMPO DEL FULL EXPLORATION PLAN – LOTE 88. | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 08.2010 – 09.2010 |
| TOROMOCHO PROJECT REPARACIÓN DE LÍNEA DE AGUA. | AKER SOLUTIONS PERU S.A / JACOBS. | MOROCOCHA, JUNÍN, PERÚ. | 06.2010 – 08.2010 |
| ASISTENCIA A DRILLING EN LOCACIÓN CASHIRIARI 1 (LOTE 88). | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 03.2008 – 07.2009 |
| UPSTREAM EXPANSION PROJECT SERVICIO DE INSTALACIÓN DEL SISTEMA DE BOMBEO DE AGUA PARA DRILLING EN CASHIRIARI 1 (LOTE 88) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 02.2008 – 04.2008 |
| ASISTENCIA A DRILLING EN LOCACIÓN PAGORENI A/B (LOTE 56) | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 04.2007 – 02.2008 |
| ESTACIÓN DE BOMBEO PAGORENI A, ABASTECIMIENTO DE AGUA Y SERVICIO DE INSTALACIÓN DE LÍNEAS DE PRODUCCIÓN | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 56, CUSCO, PERÚ. | 04.2007 – 06.2007 |
| OBRAS ELECTROMECÁNICAS NUEVO HELIPUERTO PLANTA MALVINAS | PLUSPETROL PERU CORPORATION S.A. | MALVINAS, CUSCO, PERÚ | 11.2006 – 02.2007 |
| PROVISIÓN DE PERSONAL EN LABORES DE MANTENIMIENTO Y MONTAJE PLANTA DE PISCO | PLUSPETROL PERU CORPORATION S.A. | PISCO, ICA, PERÚ. | 9.2003 |
| PROVISIÓN DE SERVICIO DE SUPERVISIÓN DE SEGURIDAD INDUSTRIAL Y PREVENCIÓN DE RIESGOS | PLUSPETROL PERU CORPORATION S.A. | CAMISEA LOTE 88, CUSCO, PERÚ. | 03.2003 – 05.2004 |
| CUADRILLA DE OBRAS CIVILES COMPLEMENTARIAS | PLUSPETROL PERU CORPORATION S.A. | MALVINAS, CUSCO, PERÚ | 01.2003 – 09.2003 |
| INSPECCIÓN ELECTROMECÁNICA Y MANTENIMIENTO DURANTE LA CONSTRUCCIÓN Y MONTAJE DE LA PLANTA DE GAS DE MALVINAS | PLUSPETROL PERU CORPORATION S.A. | MALVINAS / PISCO | 11.2002 – 08.2004 |